Parquetry Class Day 2


Opening up the panels glued up the night before is always a thrill for the students to see their work coming to fruition.

The next step is to trim the fields to make them good rectangles for the banding followed later by the borders. A variety of veneer saws were at work, ranging from pricey French saws to inexpensive Japanese ones. They all work.


The perimeter banding was applied and adhered with 192 gws glue, and the banding held in place with aluminum push pins that are surprisingly similar to those used by craftsmen 250 years ago.


Throughout the day and overnight, if a panel was not being worked it was placed in front of a box fan to drive off as much moisture as possible, to harden the glue under the parquetry. That strategy was somewhat successful.
Thus endeth Day 2.


Join the Conversation!