Musings

Workbench 1,2,3 – Day 3a

This was a short work session as it totaled only a couple of hours removing all the clamping screws from the half slabs and legs, running them through the planer, and clamping the slabs up (using standard bar clamps for this step).

The last half-day will be sawing the dovetailed tenons and removing the excess tenon-like protuberance from the bottom of the legs, truing the tops and trimming the ends, and driving home the legs in the double mortises.

 

 

 

.