Arched Bridge – Finis
The final day of bridge building involved cutting, painting, and installing the decking, which was made from the same 1×6 material used for the beams. Prior to installing the decking I mounted electrical wires to the underside of the structure. These are the wires that 1) carry electrons from the solar panels on the cabin to the power system, and 2) will eventually carry electrons back to the cabin from the system.
A little debris clearing, including the old plank walkways, and the job was done for now. I’ll let the paint weather a bit, then wait for a warmer sunny day to sand it and apply another coat of paint, sprinkling the sticky paint with play sand to give it better traction.
Between the new stone wall, arched bridge, and new wall on the lean-to on the old barn (more about that later), the vista from the side deck has been transformed.