FORP III, Day 5
Friday was a combination of several benches going together, others being palletized for shipping home, and the completed ones going into vehicles for transport home.
Early in the day the push was on to get together as many criss-cross leg vises as possible.
Once that was done it was time to merge the legs and the top. One group used hot hide glue as a lubricant and adhesive for the joints, even though the latter utility was/is superfluous.
But for most, it was a simple process of placing the top over the leg tenons and rocking the entire unit up and down, switching from end to end. Slamming the entire mass down eventually drove the top mortises onto the leg tenons soundly.
There then began a round of slamming tops followed by proud portraits of the makers and their new benches.
And out the door they went, some on to trucks, others into trailers, and some on to pallets for shipping home.
By 2PM the place was pretty much emptied and the tidying began. Then all of a sudden another FORP was finished.
Join the Conversation!