This Week
Just as last week was all about loading up and teaching Historic Woodworking (more about that later) this week is all about unspooling, laying and connecting over a thousand feet of 2-inch Heavy Duty Polyethylene water line for my hydropower system. My brother is here for a visit and I am working him like a rented mule.

The water line is heavy but not brutally so, each of the four coils is probably about 350 lbs, but being coiled up for an unknown period of time it is set hard into the coil shape. Basically it is like straightening out a giant Slinky that wants to beat you up at every turn.
Stay tuned.


Join the Conversation!